Nevada is Switch country. Switch’s LAS VEGAS 14 and 15 facility is designed for 495 MW at completion, and its LAS VEGAS Core Campus runs 315 MW across buildings 7 through 12.
The rest of the five largest operating sites cluster east of Reno in Storey County. EdgeCore’s Reno campus carries 225 MW of critical load, and Switch’s Citadel campus and Google’s Storey County campus publish no capacity figures.
The pitch is strong. Business power cost 9.06¢/kWh in May 2026, well below Tennessee, Pennsylvania, and Michigan in the same month, and Nevada cuts the sales tax on data center equipment to 2% for buyers that clear a low qualifying bar.
The constraint is the grid. NV Energy has fielded data center inquiries for 22 GW, far beyond what its current system can serve, and water and seismic risk shape every site decision.
Buyers serving California get one of the best deals in the West. Developers planning new gigawatt campuses face a single utility that is rewriting the rules for large loads.
Nevada Data Center Tracker
49data center facilities
11 operational17 planned21 colocation
Data Center Map counts 76 buildings across 4 markets here. Multi-building campuses count once, while tenant suites in shared buildings count separately.
Market Snapshot
5 Largest Operating Data Centers In Nevada
These are the five largest operating sites by published capacity. Switch dominates both Las Vegas and Reno, and every other listing appears on the map, with operating sites in green and planned ones in coral.
- Switch LAS VEGAS 14 and 15Las Vegas, at completion495 MWOperational
Tier 5 Platinum facility designed for up to 495 MW at completion, which is design capacity, not live power
- Address:
- 5660 to 5680 Badura Ave, Las Vegas
- Operator:
- Switch
- Switch LAS VEGAS Core CampusLas Vegas, campus power315 MWOperational
More than 2.4 million sq ft and 315 MW of power with 50+ network providers, per the Csquare LAS12 listing
- Location:
- Decatur Blvd, Lindell Rd and Capovilla Ave, Las Vegas
- Operator:
- Switch
- Buildings:
- LAS VEGAS 7 to 12
- EdgeCore Reno CampusMcCarran, critical load225 MWOperational
More than one million sq ft of data center space, with under 3 ms latency to Silicon Valley
- Address:
- 3000 USA Pkwy, McCarran
- Operator:
- EdgeCore
- Buildings:
- RN01 to RN03
- Switch The Citadel CampusMcCarranNot publishedOperational
Exascale campus planned for gigawatt-scale capacity on 100% renewable energy
- Address:
- 1 Superloop Circle, McCarran
- Operator:
- Switch
- Buildings:
- TAHOE RENO 1 to 7, with TR7 still planned
- Google Storey County CampusSparksNot publishedOperational
Four-building campus that uses geothermal energy, per Google
- Address:
- 7400 USA Pkwy, Sparks
- Operator:
Other operating sites, shown on the map in green: , , , , , .
5 Largest Planned Data Centers In Nevada
Tract's Silver Springs park accounts for 1,600 MW of the 1,885 MW in the five largest projects, while Copia Power's Monarch campus in Yerington lists 14 buildings.
- Tract Silver SpringsSilver Springs, park capacity1,600 MWPlanned
Master-planned data center park on 1,060 acres in Lyon County
- Location:
- Silver Springs, Lyon County
- Developer:
- Tract
- Fleet Storey County CampusSparks, campus plan230 MWPlanned
Hyperscale campus funded by $4.6 billion in senior secured notes and fully leased to an unnamed tenant
- Location:
- Storey County
- Developer:
- Fleet Data Centers
- Jet.AI MoapaMoapa, planned50 MWPlanned
Campus beside a former coal-fired power plant, reusing its utility infrastructure
- Location:
- Moapa, Clark County
- Developer:
- Jet.AI, with Choo Choo Express
- Connect RenoReno, approved5 MWPlanned
61,500 sq ft facility on seven acres with evaporative cooling
- Location:
- N Virginia St and Stead Blvd, Reno
- Developer:
- Oppidan
- Monarch Data Center CampusYeringtonNot publishedProposed
505-acre development with 14 buildings and battery and natural gas backup
- Address:
- 150 to 155 Penrose Ln, Yerington
- Developer:
- Copia Power
Other planned projects, shown on the map in coral: , , , , , , , , , , , .
5 Largest Colocation Facilities In Nevada
Retail colocation centers on Las Vegas, led by Lumen's 37,500 sq ft North Las Vegas site, with Reno's 200 S Virginia carrier hotel anchoring the north.
- Lumen Las Vegas 1North Las Vegas37,500 sq ftColocation
AC and DC power with generator and battery backup
- Address:
- 1 Aerojet Way, North Las Vegas
- Operator:
- Lumen
- Lumen Reno 1Reno12,600 sq ftColocation
AC and DC power with diverse fiber connectivity
- Address:
- 220 Gardner St, Reno
- Operator:
- Lumen
- CENTRA Reno (RNO1)RenoNot publishedColocation
Neutral meet-me-room facility in the 200 S Virginia carrier hotel
- Address:
- 200 S Virginia St, Reno
- Operator:
- CENTRA
- Flexential Las Vegas NorthNorth Las VegasNot publishedColocation
Colocation, private cages and cloud services in North Las Vegas
- Address:
- 3330 E Lone Mountain Rd, North Las Vegas
- Operator:
- Flexential
- DataBank LAS1Las VegasNot publishedColocation
Carrier-neutral colocation with SOC 1 audits
- Address:
- 7185 Pollock Dr, Las Vegas
- Operator:
- DataBank
Other colocation facilities, shown on the map as green squares: , , , , , , , , , , , , , , , .
Choose a category to switch the list and highlight its sites on the map. Click any site card to find it on the map, or click a marker to jump to its card. Pins are approximate, and each MW figure carries the basis shown beside it.
Data sourced from Data Center Map, EIA and Inflect, checked October 10, 2026. Listings count individual buildings, and the lists show the largest sites in each category.
Why Colocate In Nevada?
Nevada has more genuine advantages than most data center states: proximity to California, low power prices, clean energy options, an accessible tax break, and a climate that favors free cooling.
Six benefits hold up under scrutiny.
1. Market Access And Latency
Nevada sits next door to the largest tech market in the country. EdgeCore's Reno campus runs under 3 ms of latency to Silicon Valley, close enough for production systems that serve Bay Area users.

Las Vegas covers Southern California and the Southwest. Buyers can place production or recovery systems outside California's higher costs and seismic exposure without moving far from their users.
The reach stops at the West. East Coast and Midwest audiences still sit behind long transport hauls.
2. Network Connectivity And Peering
Switch's LAS VEGAS Core Campus hosts more than 50 network providers, which makes it the interconnection center of southern Nevada.

Reno has its own carrier hotel at 200 S Virginia St, where CENTRA runs a neutral meet-me room, a shared space where carriers and tenants cross-connect.
Retail buyers in Las Vegas can choose among Lumen, Flexential, DataBank, EdgeConneX, Fiberhub, and other operators. The densest West Coast peering still happens in Los Angeles and Silicon Valley, so Nevada works best as a low-cost extension of those hubs.
3. Low Power Prices
Nevada's power is cheap by data center standards. Business customers paid 9.06¢/kWh in May 2026, and industrial customers paid 7.61¢/kWh.

That business rate is about a third below Tennessee's 13.52¢ and Pennsylvania's 13.56¢ in the same month, and it beats Michigan's 16.09¢ by more than 7¢. Over a multi-megawatt deployment running all year, that gap adds up fast.
4. Clean Energy Options
Solar supplied 31% of Nevada's generation, and Nevada produced a quarter of U.S. utility-scale geothermal power in 2024. Natural gas still leads at 53%.

Large buyers can contract for new clean supply. Regulators approved NV Energy's Clean Transition Tariff, which lets a large customer pay for new clean generation dedicated to its load, and Google uses geothermal power at its Storey County campus.
Switch runs its Citadel campus on 100% renewable energy. For buyers with carbon targets, Nevada offers more credible clean-power paths than gas- or coal-heavy states.
5. Accessible Tax Abatements
Nevada cuts the sales and use tax on data center equipment to 2% and abates 75% of personal property tax for 10 or 20 years. The 10-year package requires $25 million of investment and 10 full-time Nevada employees within five years, paid at least the statewide average wage.

The 20-year package requires $100 million and 50 employees. A large hardware buyer saves real money: Apple's 10-year sales tax abatement on a planned $992 million equipment expansion in Washoe County came to an estimated $62 million.
Colocation tenants can qualify alongside the data center operator, with a minimum two-year agreement. That makes Nevada's break one of the few that retail and mid-size buyers can actually use.
6. Dry Climate And Free Cooling
Nevada's dry desert air extends free-cooling hours, the time when outside air can cool the data hall without chillers. Reno's cooler climate gives operators the longest free-cooling season in the state.

Las Vegas summers run hot, so southern sites rely more on mechanical cooling in July and August.
Key Cities Or Submarkets In Nevada
Nevada's market splits between Las Vegas in the south and the Reno region in the north, with the newest gigawatt projects spreading east into Lyon County.
The five submarkets below run from the deepest retail market to the largest land plays.
1. Central Las Vegas
Central Las Vegas is Switch's home turf. The LAS VEGAS Core Campus and LAS VEGAS 14 and 15, both profiled below, anchor the market, and Switch runs its Sahara campus and LAS VEGAS 2 nearby.
Retail buyers have real choice. DataBank's LAS1 at 7185 Pollock Dr offers carrier-neutral colocation with SOC 1 audits, and Flexential, EdgeConneX, Fiberhub, ColoXchange, UnitedLayer, TPx, Lumen, and Csquare run local sites.
The Las Vegas colocation market suits Southern California firms, gaming and hospitality operators, and enterprises that want Switch-grade connectivity at Nevada prices.
2. North Las Vegas, Henderson, And Southern Nevada
North Las Vegas holds the largest retail building in the state. Lumen Las Vegas 1 at 1 Aerojet Way offers 37,500 sq ft with AC and DC power, and Flexential runs a second site at 3330 E Lone Mountain Rd.
The outer valley is where new capacity is heading. Google runs a three-building campus in Henderson, Novva operates in Las Vegas and plans a North Las Vegas site, and Switch has LAS VEGAS 17 and 18, built as AI factories, plus sites in the Apex Industrial Park and its Armory campus in the pipeline.
Farther out, Jet.AI and Choo Choo Express plan a 50 MW campus in Moapa beside a former coal-fired power plant, reusing its utility connections.
3. Reno
Reno's retail market is small and centered on downtown. The 200 S Virginia St carrier hotel holds CENTRA's neutral meet-me room, and Lumen Reno 1 offers 12,600 sq ft at 220 Gardner St with diverse fiber.
Roller Network, Colovore, CC Communications, and Xogenous run smaller sites. Oppidan has approval for Connect Reno, a 61,500 sq ft, 5 MW facility on seven acres at N Virginia St and Stead Blvd, and CENTRA plans a second Reno site.
The Reno colocation market suits Bay Area companies that want a nearby recovery site and northern Nevada enterprises that need cabinets to small cages.
4. Tahoe Reno Industrial Center
Storey County's Tahoe Reno Industrial Center, east of Reno along USA Parkway, holds Nevada's largest hyperscale cluster. Switch's Citadel, EdgeCore's Reno campus, and Google's Storey County campus are all profiled below, and Apple runs a four-building campus in Sparks.
The next wave is already funded. Fleet Data Centers raised $4.6 billion in senior secured notes for a 230 MW Storey County campus that is fully leased to an unnamed tenant, and PowerHouse and Vantage have campuses planned in the Reno area. Tract's South Valley and Peru Shelf technology parks add more land in the same corridor.
This is a hyperscale and wholesale market. It suits tenants leasing full halls or buildings and offers little to retail buyers.
5. Lyon County And Yerington
Lyon County is where Nevada's largest land plays sit. Tract's Silver Springs park covers 1,060 acres with 1,600 MW of planned capacity, and Microsoft has planned sites in Silver Springs and Fernley.
Copia Power proposes the Monarch campus on 505 acres in Yerington, with 14 buildings and battery and natural gas backup.
The pipeline leans on one developer. Tract's Silver Springs park makes up about 85% of the capacity in Nevada's five largest planned projects, and its build-out depends on NV Energy delivering transmission and supply that do not exist yet.
Notable Colocation Providers And Facilities In Nevada
Three of Nevada's five largest operating sites belong to Switch, which says a lot about who controls the market. The other two are EdgeCore's wholesale campus and Google's own campus in Storey County.
The five profiles below follow the tracker's ranking.
1. Switch LAS VEGAS 14 And 15

Switch's LAS VEGAS 14 and 15 sit at 5660 to 5680 Badura Ave in southwest Las Vegas. The facility is designed for up to 495 MW at completion. That figure is design capacity, and live power today is lower.
Switch builds the site to its own Tier 5 Platinum standard, a proprietary rating the company uses for its highest-redundancy buildings.
LAS VEGAS 14 and 15 are best suited for hyperscale, AI, and large enterprise tenants that want Switch's ecosystem with room to grow into hundreds of megawatts.
2. Switch LAS VEGAS Core Campus

Switch's Core Campus spans buildings LAS VEGAS 7 through 12 along Decatur Blvd, Lindell Rd, and Capovilla Ave. The campus covers more than 2.4 million sq ft with 315 MW of power.
It is the interconnection center of southern Nevada, and the network density inside the campus is the main reason enterprises choose Switch over smaller Las Vegas providers.
The Core Campus is best suited for enterprises, cloud providers, and content networks that need dense carrier access in Las Vegas.
3. EdgeCore Reno Campus

EdgeCore's campus at 3000 USA Pkwy in McCarran covers more than 1 million sq ft across buildings RN01 through RN03. It carries 225 MW of critical load.
EdgeCore sells wholesale capacity, so tenants lease halls or full buildings. Its location gives Bay Area companies hyperscale-grade space a short hop from Silicon Valley.
EdgeCore Reno is best suited for hyperscalers, cloud providers, and large enterprises leasing capacity in multi-megawatt blocks.
4. Switch The Citadel Campus

Switch's Citadel at 1 Superloop Circle in McCarran is planned as an exascale campus with gigawatt-scale capacity. Buildings TAHOE RENO 1 through 6 are operating, and TAHOE RENO 7 is still planned. Switch does not publish current capacity.
The campus runs on renewable energy, which makes it a strong fit for buyers with strict carbon targets.
The Citadel is best suited for hyperscale, AI, and enterprise tenants that want Switch's ecosystem in northern Nevada.
5. Google Storey County Data Center Campus

Google's campus at 7400 USA Pkwy in Sparks covers four buildings. Google does not publish capacity, and Google says the campus uses geothermal energy.
The site is single-tenant and offers no colocation access. It matters to other buyers as evidence that Nevada's clean-power tariffs can support hyperscale load.
Recent Developments In Nevada (Last 12 To 24 Months)
- July 2026: NV Energy sued Tract in Washoe County District Court in late July over large-load service agreements, with much of the complaint sealed. The dispute shows how hard it has become to agree on who pays for new grid capacity.
- April 2026: Fleet Data Centers, a Tract Capital company, priced $4.6 billion of notes for a 230 MW Storey County campus with 200 MW of critical IT on 517 acres. The campus is fully leased to an unnamed tenant.
- April 2026: Fleet applied for more than 350 MW of temporary gas and diesel generation in Storey County, because NV Energy cannot serve its campuses for at least two years. Developers are building their own power to avoid waiting on the grid.
- March 2026: NV Energy told Liberty Utilities it will stop supplying 75% of the power for Liberty's 49,000 Lake Tahoe customers, citing its own resource needs. Data center demand is now reshaping supply for existing customers.
- February 2026: Fleet priced an earlier $3.8 billion note issuance for its Nevada development, showing how much capital the Reno corridor is drawing.
Drawbacks And Considerations For Colocation In Nevada

Nevada's advantages are real, and so are its constraints. Most of them trace back to power, water, and geography.
The six drawbacks below matter most when comparing Nevada with Arizona, Utah, and California.
1. A Grid That Cannot Keep Up
NV Energy cannot serve some new campuses for at least two years, which is why developers are proposing temporary gas plants. The utility projects data centers rising from 5% of its sales in 2025 to 64% by 2046, a shift its system was never built for.
2. One Utility And No Wholesale Market
Nevada has no regional transmission organization, so NV Energy is the only path to grid power for most buyers. Disputes like the Tract lawsuit leave tenants with no alternative supplier while terms are fought out.
3. Water Scarcity
Ten southern Nevada data centers used 352.6 million gallons of water for evaporative cooling in a single year. Buyers need closed-loop or air-cooled designs, and water-hungry facilities face growing scrutiny.
4. Seismic Risk In The North
Northern Nevada is seismically active. Reno-area deployments need seismic design review and a recovery site outside the region.
5. Extreme Heat In Las Vegas
Las Vegas summers run hot, which raises cooling loads and stresses generators during peak demand. Operating budgets need to model the hottest months.
6. Switch Dominates Southern Nevada
Switch runs the two largest operating sites in Las Vegas and much of its interconnection. Buyers who want large-scale, carrier-dense space in Las Vegas have limited alternatives, which reduces pricing leverage.
How Brightlio Can Help With Colocation In Nevada
Brightlio helps organizations compare Nevada colocation, cloud connectivity, AI infrastructure, and disaster recovery options across Las Vegas, North Las Vegas, Henderson, Reno, the Tahoe Reno Industrial Center, and nearby Western markets. Our team helps clients evaluate facility fit, power pricing, carrier access, compliance needs, power density, cooling design, and long-term site risk.
We compare providers such as Switch, EdgeCore, DataBank, Flexential, Lumen, CENTRA, EdgeConneX, Novva, and other Nevada operators. For Nevada projects, we pay close attention to NV Energy service timelines, large-load contract terms, tax abatement eligibility for tenants, cooling water use, seismic design in the north, summer heat in Las Vegas, carrier routes to California, and expansion rights.
Brightlio can support cabinet, cage, private suite, single-tenant, high-density, AI, and multi-site disaster recovery planning, and our quotes come free to clients. Contact Brightlio to compare Nevada colocation solutions and start planning a cost-effective and resilient deployment.
Frequently Asked Questions
1. Which U.S. State Has The Most Data Centers?
Virginia has the most data centers in the United States, led by Northern Virginia's Loudoun County cluster. Nevada is a mid-size market with 49 facilities in the tracker, though Switch's Las Vegas campuses are designed for hundreds of megawatts.
2. How Many Data Centers Are In Nevada?
Nevada has 49 data center facilities from 27 operators: 11 operational campuses, 17 planned projects, and 21 colocation sites. Data Center Map counts 76 buildings across 4 markets, since it lists campus buildings and tenant suites separately.
3. What Is The Largest Data Center In Nevada?
Switch's LAS VEGAS 14 and 15 is the largest by design capacity, built for up to 495 MW at completion. The largest planned project is Tract's 1,600 MW Silver Springs park in Lyon County.
4. Who Is Building Data Centers In Nevada?
Tract and its sister company Fleet Data Centers lead the pipeline, alongside Switch, Microsoft, Vantage, PowerHouse, and Novva. Copia Power, Jet.AI, and Oppidan are behind smaller projects in Yerington, Moapa, and Reno.
5. Are Nevada Electricity Costs Favorable For Colocation?
Yes. Business customers paid 9.06¢/kWh in May 2026 and industrial customers 7.61¢/kWh, both well below most major data center states. New large loads face stricter service terms and long waits for capacity.
6. What Tax Incentives Does Nevada Offer Data Centers?
Qualifying data centers pay a 2% sales and use tax on equipment and get a 75% personal property tax abatement for 10 or 20 years. The 10-year package needs $25 million of investment and 10 Nevada employees, and colocation tenants with at least a two-year agreement can qualify too.
7. Which Cities Are Best For Colocation In Nevada?
Las Vegas has the most retail options and Switch's carrier-dense campuses. Reno offers a downtown carrier hotel and a short hop to the Bay Area, and the Tahoe Reno Industrial Center suits wholesale and hyperscale tenants.
8. Can Nevada Colocation Support AI Or High-Density Workloads?
Yes, at the campus level. Switch is building LAS VEGAS 17 and 18 as AI factories, Fleet's Storey County campus is fully leased to a single tenant, and EdgeCore sells wholesale halls in Reno. Retail buildings are small and not designed for dense GPU racks.
9. Can NV Energy Supply Power For New Data Centers?
Not quickly. NV Energy has fielded data center inquiries for 22 GW and signed agreements for about 6 GW of transmission and substation work. Those agreements cover delivery only, and the generation to fill them still has to be built. Its proposed Large Load Electric Service Agreement would make large customers commit long term and pay for the infrastructure they need.
10. Who May Not Need Nevada Colocation?
Buyers serving users mainly on the East Coast or in the Midwest gain little from Nevada's location. Water-intensive cooling designs face scrutiny, and developers who need firm grid power within a year will struggle to get it from NV Energy.
Keep reading with our colocation guides for these nearby markets:

Tamzid is a cybersecurity researcher with 5+ years of experience across SaaS, security, compliance, data centers and cloud. He writes for brightdefense.com and hipaasimple.com, covering security, compliance, and infrastructure topics. Certified through Cisco, Fortinet (NSE 1), and the Basel Institute on Governance in OSINT, he grounds his work in primary sources and verified data.
Recent Posts
Data Centers and Colocation In Michigan
Data Centers and Colocation in Wisconsin
Data Centers and Colocation in Tennessee
Data Centers and Colocation In Nevada
Let's start
a new project together